Youngstown State University Pedestrian Bridge
BCR is proud to support Youngstown State University with critical repairs to a campus pedestrian bridge—an essential connection between the Wick Avenue Parking Deck and the main campus. This fast-track summer project addressed major structural challenges under an extremely aggressive schedule and within a highly constrained site. Scope of work included:Complete structural repair and stabilization…
-
Lifetime 5 Seasons
BCR has been working with a private owner in Cincinnati, Ohio, to resolve water intrusion problems that have existed since the facility was first built. Our team has been repairing the building envelope to restore integrity and performance — including installing new flashings, rebuilding damaged wall sections, repairing masonry, and replacing deteriorated lintels. BCR is…
-
Jackson Memorial Building
BCR was working with the City of Jackson to carefully dismantle and remove the historic limestone façade of the Jackson Memorial Building in Jackson, Ohio. After decades of challenges related to the use of the original 1936 building, the decision was made to replace the structure with a new facility designed to better serve the…
-
Great American Ballpark
BCR has wrapped up up a busy summer performing a series of structural and waterproofing repairs at Great American Ball Park in Cincinnati, Ohio. The final phase has involved a complex split-slab restoration — including full removal of the existing overlay, installation of new hot-applied waterproofing, and placement of a new topping slab. Getting concrete…
-
Heath Waste Water Treatment Plant
BCR is proud to support the City of Heath with repairs to the Heath Wastewater Treatment Plant in Heath, Ohio. Our team performed concrete repairs, crack injection, sealant replacement, and expansion joint restoration to help extend the life and durability of this critical facility. BCR is committed to supporting the infrastructure that keeps America running…
-
Columbus City Schools
BCR is proud to support Columbus City Schools with façade repairs across multiple campuses in Columbus, Ohio. Working at both Northland High School and Columbus Gifted Academy, our work includes masonry restoration, sealant replacement, and flashing upgrades—improving durability, energy efficiency, and safety for students and staff. Investing in school infrastructure means investing in the future…
-
Rhinegeist Brewery Facade
BCR is proud to restore the façade of Rhinegeist Brewery in the historic Over-the-Rhine neighborhood of Cincinnati, Ohio. Originally built in 1895 as part of the Christian Moerlein Brewing Co. complex, this building has stood as a symbol of Cincinnati’s rich brewing heritage for more than a century. After decades of vacancy, it was brought…
-
University of Cincinnati Old Chem Expansion Joint
BCR is proud to support the renovation of the historic Old Chemistry Building at the University of Cincinnati. Built in 1917, this iconic structure has long been a cornerstone of UC’s academic legacy. The almost $70 million dollar project includes renovation/updating of the original structure and adding a new, state-of-the-art lab and classroom wing to…
-
Olentangy Orange Highschool
BCR completed a façade restoration of Olentangy Orange High School. Our team addressed critical repairs to the through-wall flashing in multiple areas of the building. Originally constructed in 2008, the facility experienced water infiltration due to oversights in the initial construction. Our restoration work was essential to resolving current water-related concerns and preventing future damage.…