• Towers of Kenwood


    BCR completed a concrete/waterproofing project for a senior living facility in Cincinnati, Ohio. Water infiltration into an underground parking structure has been an issue for the facility for years. BCR removed the concrete plaza deck, installed a new waterproofing system, and reinstalled the concrete plaza deck. Our passion is extending the life of your structures!

  • St. Clair Lofts


    Location: Dayton, Ohio BCR has completed the restoration work on the historic St. Clair Lofts Building in downtown Dayton, Ohio. Prior to its conversion into luxury apartments, the building was originally occupied by the Dayton Engineering Laboratory Company (DELCO). In 1910, Charles Kettering initiated the production of the self-starter for automobiles at this location, eliminating…

  • St. Luke’s Catholic Church


    Location: Nicholasville, Kentucky BCR is the general contractor leading the project that includes structural reinforcement of the wood framing, roof replacement, plumbing/electrical upgrades, restoration of the stone tower as well as masonry restoration.  

  • Rumpke Elmwood Recycling Center


    Location: Cincinnati, Ohio BCR has completed the restoration work on Rumpke Elmwood Recycling Center in Cincinnati, Ohio. At this central Cincinnati recycling depot, BCR restored the concrete underneath 2 recycling bailer machines, as well as applied a traffic coating, cutting out part of the facility wall and installing steel beams to allow for the instillation…

  • Mercy Stone Bridge


    Location: Cincinnati, Ohio BCR completed structural repairs at the Mercy Health Stone Bridge facility in Cincinnati, Ohio. The facility, first constructed in 1924, was originally built as a Franciscan Seminary called St. Francis Seminary. Listed on the National Park Service’s National Registry of Historic Places, the main building stands as a shining example of Renaissance…

  • PNC Tower Garage


    Location: Lexington, Kentucky BCR was the repair contractor for the PNC Tower Garage in Lexington, Kentucky. The work included concrete repairs throughout, structural repairs to deteriorated hollow core plank, installation of supplemental steel beams, and repair/replacement of two separate stair towers. The final phase of the project was the removal and reinstallation of the traffic…